Posted on June 20, 2025 at 2:06 PM by Rick Belcher
This week at the Bristol Quarry Landfill, crews replaced a leachate pump in a dual phase extraction well and performed maintenance activities on spare leachate pumps. The stormwater pump was also utilized by crews to remove surface water that accumulated from recent rain events at the landfill.