Posted on September 9, 2025 at 11:34 AM by Rick Belcher
Crews were busy with several routine maintenance projects this week at the Bristol Quarry Landfill. A leachate extraction pump was removed for cleaning and repairs, while reserve leachate extraction pumps were rebuilt. General maintenance was performed on the gas extraction wells and the stormwater pump was utilized to remove accumulated surface water.