Posted on September 12, 2025 at 2:19 PM by Rick Belcher
Crews this week at the Bristol Quarry Landfill installed a new lateral gas line and cleared condensation build-up throughout the gas extraction system to improve efficiency. Accumulated surface water at the landfill was also removed by operating the stormwater pump.