Posted on February 13, 2026 at 3:18 PM by Rick Belcher
The stormwater pump at the Bristol Quarry Landfill, which is used to remove surface water, is back operating at full efficiency after necessary repairs were made last week. Routine maintenance activities were also conducted this week on the flare, gas extraction system, and well heads.