Posted on February 27, 2026 at 8:00 PM by Rick Belcher
Crews at the Bristol Quarry Landfill spread soil to address areas affected by settlement this week. Surface water was also removed with the stormwater pump, and routine maintenance was conducted on the landfill gas system and well heads.